US-CMS Upgrades Project Office

US-CMS Upgrades Project Office

This page contains information and links for the Project Office of the US LHC CMS Detector Upgrade Project. See also the Fermilab SharePoint site used for our CD-2/3 reviews

 


 

CD-1 Vidyo Meetings

The regular and informal CD-1 Team meetings are always held in the same Vidyo meeting room:

 

 

 


lucas

Access to USCMS Upgrade Project Office Content

Access to USCMS Upgrade Project Office Content
Access to the US-CMS Upgrades Project Documents and Website

People working on the US-CMS Upgrades Project will generally need access to:

  1. The CMS DocDB document database where we store project documents
  2. The US-CMS Upgrades website, which is a protected part of the CMS website

If you are a CMS Collaborator and already have access to the internal CMS website and DocDB, then just Email a request to Lucas.Taylor@cern.ch telling him your user ID and you will be given the necessary access rights. If you are not a CMS Collaborator (e.g. non-CMS Fermilab staff, contractor, etc.) then you first need to register at CERN as an external user. This takes one minute by filling in your Email address as user ID on this web form and choosing a password (different from your usual password). Then to get access to the US Upgrades documents and website just Email a request to Lucas.Taylor@cern.ch telling him the Email address that you registered above and he'll give you the necessary access rights. Then, when you access a document or web page and are asked for a user ID and password, just enter your Email and password (as you registered above). When using DocDB to add or modify a document you may grant access to the US Upgrades Project Office people by selecting the US ProjectOffice Group in the access control pull-down menus ("Who can see this?" and "Who can modify this?"). Click Advanced to show all of the groups that can be selected.

Access to the svn Repository containing the US-CMS Upgrades CDR

Access to the svn repository is controlled by CERN afs userid. If you need access and do not already have it, contact Lucas Taylor (or George Alverson).

Access to information for the US-CMS Upgrades Reviewers

All documents that the reviewers need to see will be stored in DocDB.

  1. A public entry-level webpage will be created for the reviewers with useful links and general information (but not any confidential information). FIXME: decide where to host this. Could be either Fermilab or CERN.
  2. All documents and confidential data for the reviewers will be stored in DocDB. They should be tagged as readable by the DocDB groups US Reviewers and US ProjectOffice. If appropriate they may also be tagged as readable by CMS members only or, in exceptional cases, they may be completely Public. The reviewers will be given a single user + password combination that will grant them access to the DocDB documents in the group US Reviewers.
  3. FIXME: Will we give reviewers access to Primavera and/or COBRA? If so, how?
  4. An e-group has been created to enable you to send Email to the reviewers.
How is access control actually handled (what's under the hood)?

CERN- and CMS-standard procedures are used to securely manage who can access US-CMS Upgrade Project information:

  1. The CERN e-group system enables users to be added and removed from access control lists
  2. The CMS website has role-based access control, with roles mapping to e-groups (e.g. the Drupal role uscms-upgrades-project-office maps to the uscms-upgrades-project-office egroup)
  3. The CMS DocDB system has group-based access control, with groups mapping to e-groups (e.g. the DocDB group US ProjectOffice maps to the uscms-upgrades-project-office egroup)

So why must project office members register with CERN to access DocDB but the reviewers don't have to? The project office people have to register because they will be granted write access to DocDB. Reviewers can only read documents. This read-only mode of access is implemented by having a separate DocDB instance running just for this purpose with a local DocDB user defined for the reviewers that grants them read access to the appropriate (selected) documents. FIXME: Eric will set this up soon.

Granting or revoking a person's access rights to documents

To add or remove access rights to documents, add or remove the corresponding person using the CERN e-group system..

 

 

 

lucas

DOE and Fermilab Project Management Guidance

DOE and Fermilab Project Management Guidance

The US-CMS Upgrades Project is subject to the DOE 413.3B Order relating to "Program and Project Management for the Acquisition of Capital Assets" as well as Fermilab requirements. For full details, see the left sidebar menu.

 

 

 

 

 

lucas

DOE 413 Program and Project Management Guidance

DOE 413 Program and Project Management Guidance
DOE 413 Policies
DOE P 413.1 Program and Project Management Policy for the Planning, Programming, Budgeting and Acquisition of Capital Assets
DOE P 413.2 Value Engineering
DOE 413 Orders
DOE O 413.1B Internal Control Program
DOE O 413.2B Laboratory Directed Research and Development
DOE O 413.3B Program and Project Management for the Acquisition of Capital Assets
DOE O 414.1C Quality Assurance
DOE 413.3 Guides
DOE G 413.3-1 Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A
DOE G 413.3-2 Quality Assurance Guide for Project Management
DOE G 413.3-3 Safeguards and Security for Project Management
DOE G 413.3-4 Technology Readiness Assessment Guide
DOE G 413.3-5 Performance Baseline Guide
DOE G 413.3-6 High Performance Sustainable Building
DOE G 413.3-7A Risk Management Guide
DOE G 413.3-8 Environmental Management (EM) Cleanup Projects
DOE G 413.3-9 Project Review Guide for Capital Asset Projects
DOE G 413.3-10 Earned Value Management Systems (EVMS)
DOE G 413.3-11 Project Management Lessons Learned
DOE G 413.3-12 Project Definition Rating Index Guide
DOE G 413.3-13 Acquisition Strategy Guide for Capital Assets Projects
DOE G 413.3-14 Information Technology Project Guide
DOE G 413.3-15 Guide for Project Execution Plans
DOE G 413.3-16 Project Transition/Closeout (CD-4)
DOE G 413.3-17 Mission Need Statement Guide
DOE G 413.3-18 Integrated Projects Teams Guide for Use with DOE 413.3A
DOE G 413.3-19 Federal Staffing Guide for Project Management
DOE G 413.3-20 Change Control Management Guide
DOE G 413.3-21 Cost Estimating Guide
DOE G 430.1 Total project costs and other project costs

See also:

 

 


lucas

Deliverables for CD1

Deliverables for CD1

This page summarizes DOE and Fermilab CD-1 requirements, includes links to documents in DocDB, provides a brief description of each document, and identifies one or more contacts in DOE and/or the Project Office. The Federal Project Director is identified as "FPD". Text that appears in [BRACKETS] refers to references at the bottom of the page.   FIXME: Add a link to the Director's Review and CD-1 Review charges when we receive them. [CHARGE].


Deliverables
 
[REFERENCES]
Required Documents
 
(and document contents)
Purpose and Description of Document Contact
Overall Project Management
Key assumptions document   [ASSUMPTIONS] [CONTINGENCY] [LABOR] Key Assumptions [CMS-doc-11577]   1. Cost and schedule     — Contingency Rules     — Labor Charging   2. Technical Assumptions   3. Programmatic Assumptions   This document describes cost, schedule, technical, and programmatic assumptions for the Project. The document contains key assumptions and is not intended to be all-inclusive. This is a living document. Its purpose is to provide up-to-date guidance on key assumptions that will affect project management decisions.   Some of the sections in this document will be more fully described in other project documents such as the PEP, PMP, and CDR. This document serves as an easy reference for key assumptions for the Project. Joel B. Erik G.
Preliminary Project Execution Plan   [PEP] Preliminary PEP [CMS-doc-11572]   1. Introduction   2. Project Baseline   3. Life Cycle Cost   4. Acquisition Approach   5. (CDx) Tailoring Strategy   6. Baseline Change Control   7. Management Structure and IPT   8. Project Management / Oversight   This document describes the mission need and justification for the Project, its objectives and scope, the DOE management structure, the resource plan, and the environmental, safety, and health (ES&H) requirements. The document also establishes the technical, cost, and schedule baselines against which performance will be measured by DOE. DOE Baseline Change Control thresholds are also established in this document.   The PEP can include a Critical Decision (CD) tailoring strategy, if this is needed. FPD Joel B.
Preliminary Project Management Plan   [PMP] Preliminary PMP [CMS-doc-11569]   1. Introduction   2. Justification of Mission   3. Management, Organization, Responsibilities   4. Work Breakdown Structure   5. Technical, Schedule and Cost Baseline   6. Risk Management   7. Project Controls System   8. Acquisition Strategy   9. Technical Considerations   10. Quality Assurance Program   11. Value Management   12. Configuration Management   13. Engineering Design Review   14. Integrated Safety Management   This document describes the Project by providing an overview of project objectives, organization, management, and review mechanisms. The document supplements the PEP by providing details specific to the management of the Project. Joel B. Erik G.
Scope, Cost and Schedule Management
Conceptual Design Report   [CDR] CDR [CMS-doc-11562]   1. Summary and Overview           Science Requirements           Conceptual Design           Alternatives Analysis           Key Performance Parameters           Cost & Schedule   2. Physics Case   3. HCAL           Technical Requirements           Proposed Design           Alternatives Considered           Risks           ES&H, QA, QC, Value   4. Pixels           Technical Requirements           Proposed Design           Alternatives Considered           Risks           ES&H, QA, QC, Value   5. L1 Trigger           Technical Requirements           Proposed Design           Alternatives Considered           Risks           ES&H, QA, QC, Value   6. Project Management           Configuration Management           Scope Management           Cost Management           Schedule Management           Quality Management           Risk Management           Procurement Management     Joel B..         Joel B.   Drew B. Frank C. Jeremy M Chris T.     Simon K. Will J.         Darin A. Sergo J. Wesley S       Joel B. Erik G. Lucas T.
Cost and Schedule Range (includes Resource Loaded Schedule (RLS), BoE's, and lifecycle costs.   [WBS] [BoE] [COST] [SCHEDULE] [MILESTONES] WBS dictionary • WBS   1. Project Management   2. HCAL   3. Pixels   4. L2 Trigger • BoE form instructions • BoE [ All BoEs in DocDB ] • Summary Schedule • Critical path • Project Milestones • Cost Book • Cost and Schedule Range   Travis   &  L2's
Risk Management
Risk Management Plan   [RISK PLAN] Refer to Fermilab Risk Management Plan (M. Dinnon) in the PEP, PMP, and CDR. Text in the PEP, PMP, and CDR will refer to the Fermilab Risk Management Plan (RMP), which describes a process for identifying, evaluating, tracking, abating, and managing project risk in terms of risk categories: cost, schedule, ES&H and technical performance.   N/A
Risk Register   [RISK REGISTER] Risk Register & Assessment   Lucas T. Erik G.
Quality Management
Preliminary Quality Assurance Program (QAP)   [QUALITY PLAN] Quality Assurance Program [CMS-doc-11584]   1. Purpose   2. Scope   3. Graded Approach   4. Management   5. Quality Improvement   6. Performance/Criteria   7. Procurement   8. Inspection and Acceptance Testing   9. Assessment   10. Implementation   This document describes the Quality Assurance (QA) program for the Project. Its purpose is to state the QA requirements and describe how the requirements will be satisfied. It discusses how the QA criteria will be satisfied using a graded approach. This QAP is established in accordance with DOE Order 414.1C "Quality Assurance" and Fermilab's Integrated Quality Assurance Program. The QAP is implemented through the policies set forth in the PEP and the PMP. This QAP is reviewed at least annually and revised with the approval of the Project Manager for the LHC CMS Detector Upgrade Project. Joel B. Erik G.
Procurement
Acquisition Strategy   [ACQUISITION STRATEGY] • Acquisition Strategy   1. Justification of Mission Need   2. Project Description and KPPs   3. Alternatives Analysis   4. Recommended Alternatives   5. Total Project Cost Range   6. Funding Profile   7. Key Milestones and Events   8. Tailoring Strategy   9. Business and Acquisition Approach   10. Management Structure and Approach   11. Risk Analysis This document describes the DOE acquisition strategy for the LHC CMS Detector Upgrade Project. It describes the DOE's perspective of how the Project is to be managed. A preliminary version of this document is required for CD-1 and a final, signed version is required for CD-2. FPD Joel B.
Procurement Management Plan Procurement Management Plan [CMS-doc-11585] This document describes how the Project will obtain the goods and services required to accomplish the mission of the Project. Joel B.
ES&H -- Environment, Safety and Health
Comply with the One-for-One Building Space Replacement   This document may not be needed for LHC CMS Detector Upgrade Project for CD-1. N/A
Document High Perf. & Sustainable Bldg. & Sustainable Env. Stewardship considerations   This document may not be needed for LHC CMS Detector Upgrade Project for CD-1. N/A
Preliminary Hazard Analysis Report   [HAZARD ANALYSIS]   1. Executive Summary   2. Introduction   3. Description of Site, Facility   4. Identification of Hazards   5. Results and Assessments   6. Operations   7. Preliminary Hazard List   8. Conclusions   9. Appendix A: Risk Categorization   10. Appendix B: Hazard Worksheet This document provides a preliminary assessment of potential hazards associated with the Project, and describes criteria used to mitigate these hazards.  Stefan Gruenendahl
Integrated Safety Management Plan   [SAFETY] Integrated Safety Management Plan [CMS-doc-11587] This document describes the Integrated Safety Management (ISM) Plan for the Project.  Stefan Gruenendahl
NEPA (National Environmental Policy Act) Document   [NEPA & EENF] Table of Contents:   1. Describe Proposed Action & Need   2. Describe Affected Environment   3. Potential Environmental Effects   4. NEPA Recommendation   5. NEPA Coordinator Review   6. Comments on items in Section 3 NEPA establishes requirements for all federal agencies to prepare environmental assessments and impact statements, indicating environmental effects of proposed federal agency actions. The purpose of this document is to describe environmental impacts of the LHC CMS Detector Upgrade Project.  Stefan Gruenendahl
Other Related Documents
CMS Technical Design Documents HCAL Upgrades TDRPixel Upgrades TDR   N/A
LHC and CMS constraints and assumptions • LHC / CMS schedule   N/A
Other • Draft MOUs w/ US institutes • Draft SOWs w/ US institutes   Joel B.

 

 

References

 

Some non-CMS material below is protected (ask Erik how to get access).

 

[CHARGE] • MicroBooNE Director's Review charge

[ASSUMPTIONS] • mu2e key assumptions
MicroBooNE key assumptions

[PEP] • mu2e prelim PEPmu2e org chartmu2e Configuration Management and Change ControlMicroBooNE prelim PEPMicroBooNE org chartMicroBooNE Configuration Mgmt

[PMP] • US-CMS Construction Project PMPmu2e prelim PMPMicroBooNE prelim PMP [CDR] • mu2e CDRMicroBooNE CDR

[CONTINGENCY] • mu2e Contingency RulesMicroBooNE Contingency RulesMicroBooNE Contingency Table

[LABOR] • Fermilab Labor Charging Practices for Projectsmu2e Labor Charging (1)mu2e Labor Charging (2)

[WBS] • MicroBooNE WBSMicroBooNE WBS Dictionarymu2e WBS Dictionary

[BoE] • MicroBooNE BoE DirectoryMicroBooNE BoE Form Instructions [COST] • mu2e Cost Bookmu2e Cost Rangemu2e Life Cycle Costs

[SCHEDULE] • MicroBooNE RLS Gantt Chartmu2e Schedulemu2e Critical PathMicroBooNE MS Project ScheduleMicroBooNE Schedule Overview

[MILESTONES] • MicroBooNE Milestonesmu2e Milestones

[RISK PLAN] • mu2e Risk Mgmt PlanMicroBooNE Risk Mgmt Plan

[RISK REGISTER] • mu2e prelim Risk RegisterMicroBooNE prelim Risk Register and Assessment

[QUALITY PLAN] • mu2e Quality Mgmt PlanMicroBooNE QA Plan

[ACQUISITION STRATEGY] • mu2e Acquisition StrategyMicroBooNE Acquisition Strategy

[HAZARD ANALYSIS] • mu2e prelim HAMicroBooNE prelim HA

mu2e Integrated Safety Mgmt Plan • MicroBooNE Integrated Safety Mgmt Plan [NEPA & EENF] • NEPA and EENF examples

 

 

 

 

 

lucas

Internal Review Preparations

Internal Review Preparations

This page is a placeholder menu item for upcoming review pages

 

These pages are only visible to the project team until it is decided to make them visible to the reviewers

 

 

 

 

 

lucas

CD-2/3 Director's Review

CD-2/3 Director's Review

 

 

This page is obsolete --please use this:

new page at Fermilab

 

 


 

 

LHC CMS Detector Upgrade Project

Fermilab, MMMM DD—DD, 2014




Previous Reviews
CMS-doc-#
2014-08-27: Report of the CD-1 DOE Review 12229
2013-07-18: Report of the CD-1 Director's Review 11971
2013-05-16: Report of the Director's Independent Design Review 11859
2012-08-15: CD-0 Mission Need (redacted) 11596

 

General Links
 
DOE SC Office of Project Assessment  
Fermilab Office of Project Support Services (OPSS)  
Program and Project Management for the Acquisition of Capital Assets DOE Order 413.3B

 

Top-level Plans
 
Acquisition Strategy 11947 Update if reqd. and approve
Key Assumptions 11577 Update if reqd.
Project Execution Plan (PEP) 11572 Update if reqd. and approve
Project Management Plan 11569 Update if reqd. and approve
Configuration Management Plan 11936 Update if reqd. and approve
Procurement Management Plan 11585 Update if reqd. and approve
Proposal for the Joint Monitoring of DOE and NSF Earned Value Management Information 12216 Draft -- for approval

 

Project Organization
 
CMS / Fermilab Organization chart 11804 OK
US-CMS Upgrade Project Organization Chart 11822 OK

 

Technical Design
 
LHC CMS Detector Upgrade Project - Technical Design Report 12201 Draft -- in progress
Document describing completeness of design FIXME Not started
LHC CMS Detector Upgrade Project - Conceptual Design Report 11562 OK
401.02 HCAL Upgrades - CMS Technical Design Report CERN-LHCC-2012-015 Approved
401.03 Pixel Upgrades - CMS Technical Design Report CERN-LHCC-2012-016 Approved
401.04 Trigger Upgrades - CMS Technical Design Report CERN-LHCC-2013-011 Approved

 

Project Scope
 
401. LHC CMS Detector Upgrades Project - Work Breakdown Structure (WBS) 11605 Stable
401. LHC CMS Detector Upgrades Project - Glossary and WBS Dictionary 11801 Update if necessary
401.02 HCAL - Work Breakdown Structure 11606 Stable
401.03 FPIX - Work Breakdown Structure 11607 Stable
401.04 Trigger - Work Breakdown Structure 11608 Stable

 

Project Cost
 
Cost estimate uncertainty -- Contingency Rules 11598 Stable
Cost Basis of Estimates (BoEs) Index of BoEs Update and review
401. LHC CMS Detector Upgrades - Cost Book 11840 Update

 

Project Schedule
 
401. LHC CMS Detector Upgrades Project - Milestone Dictionary 11946 Update and review
401. LHC CMS Detector Upgrades Project - Milestones ordered by date (waterfall report) 12009 Update and review
Project Schedule for: 401. LHC CMS Detector Upgrades Project 11836 (All) Update and review
Project Schedule for: 401.01 Project Management 11836 (PM) Update and review
Project Schedule for: 401.02 HCAL 11836 (HCAL) Update and review
Project Schedule for: 401.03 FPIX 11836 (FPIX) Update and review
Project Schedule for: 401.04 Trigger 11836 (Trigger) Update and review
Critical Path for: 401. LHC CMS Detector Upgrades Project 11836 (Project CP) Analyze and review
Critical Path for: 401.02 HCAL 11836 (HCAL CP) Analyze and review
Critical Path for: 401.03 FPIX 11836 (FPIX CP) Analyze and review
Critical Path for: 401.04 Trigger 11836 (Trigger CP) Analyze and review

 

Project Risk
 
(Preliminary) Risk Management Plan 11701 Update for PRA
(Preliminary) Risk Register 11707 Update and analyze in PRA

 

Safety and Quality Assurance
 
Integrated Safety Management Plan 11587 Approved -- check if updates needed
Quality Management Plan 11584 Approved -- check if updates needed
Preliminary Hazard Analysis Report 11816 Approved -- check if updates needed
NEPA categorical exclusion 11958  

 

 

 

 

lucas

Index of BoEs for CD-2/3

Index of BoEs for CD-2/3

This page lists all cost Basis of Estimate (BoE) documents for the "LHC CMS Detector Upgrade Project".
Additional documentation is referenced under "Supporting Docs" and from the cover pages of the BoE files.

The Glossary and WBS Dictionary provides a short description of terms used and the WBS elements.

 

401.01
Project Management
BoE DocDB #
Supporting docs
401.01.01 Project Management Milestones and Interfaces    
401.01.02 Project Management & Administration 11644  
401.01.03 Project Controls & Finance 11645  
401.01.04 Project Office Support 11646  
       
401.02
Hadron Calorimeter (HCAL) Upgrade
BoE DocDB #
Supporting docs
401.02.01 HCAL Milestones and Interfaces    
401.02.02 HCAL Management 11743  
401.02.03 HF Front-End    
401.02.03.01 —— Milestones and Interfaces    
401.02.03.02 —— PMT Signal Cables (OFF-PROJECT) 11691 11633  
401.02.03.03 —— QIE10 ASIC 11616 12027
401.02.03.04 —— Front-End System Design and Prototyping    
401.02.03.04.01 ——— Prototype HF Crate 11695 11771
401.02.03.04.02 ——— Prototype HF QIE Card 11696 11621
401.02.03.04.03 ——— Prototype HF ngCCM 11697 11889
401.02.03.04.04 ——— Prototype HF Calibration Module 11698 11963
401.02.03.04.05 ——— HF Frontend Prototype System Testing 11699 11881
401.02.03.05 —— Front-End Crates and Backplanes (OFF-PROJECT) 11636  
401.02.03.06 —— QIE Cards (OFF-PROJECT) 11676  
401.02.03.07 —— Calibration System 11677 11965
401.02.03.08 —— HF ngCCM 11678 11890
401.02.03.09 —— Low Voltage System Upgrade 11679 11882
401.02.03.10 —— Optical Fiber Plant 11637 11883
401.02.03.11 —— HF Cable Adapter Boards 11710 11884
401.02.03.12 —— HF Testing & Burn-In 11680 11885
401.02.03.13 —— HF Front-End Installation 11681 11886
401.02.04 HB/HE Front-End    
401.02.04.01 —— Milestones and Interfaces    
401.02.04.02 —— SiPM 11660 11848
401.02.04.03 —— Optical Decoder Unit 11618 11634
401.02.04.04 —— SiPM Control Board 11638 11938
401.02.04.05 —— QIE11 ASIC SiPM Version 11630 11632
401.02.04.06 —— Radiation Hard FPGA 11711 11998
401.02.04.07 —— QIE Cards 11639 11994
401.02.04.08 —— Calibration System 11640 11995
401.02.04.09 —— HB/HE ngCCM 11661 11993
401.02.04.10 —— Cooling System 11662 11900
401.02.04.11 —— Readout Module Mechanics 11663 11900
401.02.04.12 —— Integrated Readout Modules 11641 11901
401.02.04.13 —— Detector Safety System 11664 11778
401.02.04.14 —— Low Voltage 11665 3647
401.02.04.15 —— RBX Level Testing & Burn-In 11666 11902
401.02.04.16 —— HB/HE Installation & Commissioning 11667 11903
401.02.05 HCAL Back-End    
401.02.05.01 —— Milestones and Interfaces 11787  
401.02.05.02 —— uHTR Design & Firmware 11674 11941
401.02.05.03 —— uHTR HF (OFF-PROJECT) 11693  
401.02.05.04 —— uHTR HB/HE 11647 11648
401.02.05.05 —— AMC13 11650 11649
401.02.05.06 —— MicroTCA Crates 11654 11651
401.02.05.07 —— MicroTCA Control Hub (MCH) 11655 11652
401.02.05.08 —— MicroTCA Power Module 11656 11653
401.02.05.09 —— MicroTCA AC/DC Converter 11668 11702
401.02.05.10 —— Integrated HF MicroTCA Crates 11669 11942
401.02.05.11 —— HF MicroTCA Installation & Commissioning 11670 11945
401.02.05.12 —— Optical Splitters 11671 11719
401.02.05.13 —— Integrated HB/HE MicroTCA Crates 11672 11943
401.02.05.14 —— HB/HE MicroTCA Installation & Commissioning 11673 11944
401.02.05.15 —— HCAL/Trigger Connection Optics 11868 11869
       
401.03
Forward Pixels (FPIX) Detector Upgrade
BoE DocDB #
Supporting docs
401.03.01 FPIX Milestones and Interfaces    
401.03.02 FPIX Management 11744  
401.03.03 FPIX Components    
401.03.03.01 —— Module    
401.03.03.01.01 ——— Sensor 11614  
401.03.03.01.02 ——— Bump Bonding 11704  
401.03.03.01.03 ——— Pixel Module Assembly & Testing 11730  
401.03.03.02 —— Electronics    
401.03.03.02.01 ——— Pixel Readout Chip 11705  
401.03.03.02.02 ——— Token Bit Manager (TBM) & Other ASICs 11706  
401.03.03.02.03 ——— High Density Interconnect (HDI) 11708  
401.03.03.02.04 ——— Port Card 11709  
401.03.03.02.05 ——— Cables. Connectors & Fibers 11714  
401.03.03.02.06 ——— Pixel Optohybrid (POH) 11723  
401.03.03.02.07 ——— Power Supply System 11724  
401.03.03.02.08 ——— DAQ Hardware 11725  
401.03.03.03 —— Mechanical Structures and Cooling  
401.03.03.03.01 ——— Half Disk Mechanics 11726  
401.03.03.03.02 ——— Half Cylinder 11727  
401.03.03.03.03 ——— Cooling Tubes 11728  
401.03.03.03.04 ——— Integration & Testing 11740  
401.03.03.03.05 ——— Installation Fixture & Testing 11739  
401.03.04 FPIX Assembly & Testing    
401.03.04.01 —— Half Disk detector assembly and testing 11731  
401.03.04.02 —— Half cylinder detector assembly and testing 11746  
401.03.04.03 —— Detector control system (DCS) 11748  
401.03.04.04 —— Test Stand and Database 11747  
401.03.04.05 —— DAQ development for system test 11742  
401.03.04.06 —— Delivery to TIF at CERN 11736  
401.03.04.07 —— Reassembly and test at TIF 11737  
401.03.04.08 —— Commission test 11738  
401.03.05 FPIX Pilot System    
401.03.05.01 —— Pilot System Components 11735  
401.03.05.02 —— Test system hardware 11734  
401.03.05.03 —— Test system software & database 11732  
401.03.05.04 —— FPIX pilot system delivery to CERN 11729  
       
401.04
Trigger Upgrade
BoE DocDB #
Supporting docs
401.04.01 Trigger Milestones and Interfaces    
401.04.02 Trigger Management 11745  
401.04.03 Muon Trigger    
401.04.03.02 —— MUON Port Card Mezzanine (MPCM)    
401.04.03.02.01 ——— MPCM Software and Firmware 11749  
401.04.03.02.02 ——— MPCM Production 11750 11922
401.04.03.02.03 ——— MPCM Test, Install, Commission 11751  
401.04.03.03 —— MPC-EMUTF Optical Fibers 11752 11923
401.04.03.04 —— End-Cap Muon Track-Finder    
401.04.03.04.01 ——— EMUTF Software and Firmware 11753  
401.04.03.04.02 ——— EMUTF Production 11754 11924 11925
401.04.03.04.03 ——— EMUTF Test, Install, Commission 11755  
401.04.03.05 —— EMUTF Infrastructure 11756 11926
401.04.03.06 —— MUON Sorter (MS)    
401.04.03.06.01 ——— MSM Software and Firmware 11757  
401.04.03.06.02 ——— MSM Production 11758 11927
401.04.03.06.03 ——— MSM Test, Install, Commission 11759  
401.04.03.06.04 ——— MS-EMUTF Firmware and Software 11892  
401.04.03.06.05 ——— MS-EMUTF Test and Commission 11893  
401.04.04 Calorimeter Trigger    
401.04.04.02 —— Calorimeter Trigger Processor    
401.04.04.02.01 ——— CTP7 Software and Firmware 11760  
401.04.04.02.02 ——— CTP7 Production 11761 11924 11928
401.04.04.02.03 ——— CTP7 Test, Install, Commission 11762  
401.04.04.03 —— Crosspoint I/O Card (CIOx)    
401.04.04.03.01 ——— CIOx Software and Firmware 11763  
401.04.04.03.02 ——— CIOx Production 11764 11929
401.04.04.03.03 ——— CIOx Test, Install, Commission 11765  
401.04.04.04 —— CTP Infrastructure 11766 11926
401.04.04.05 —— Optical Receiver Mezzanines 11767  
401.04.04.06 —— oSLB-oRM Optical Fibers 11768  
 

 

lucas

Fermilab Internal Cost and Schedule Assessment

Fermilab Internal Cost and Schedule Assessment

LHC CMS Detector Upgrade Project

Fermilab, May 15-17, 2013

This page contains links to documents to be assessed in this informal review of cost and schedule.

Follow these instructions for reviewers to get access to the documents below in the CMS DocDB database.

 

 

 



Overview Documents

 

CMS-doc-#
Key Assumptions 11577
DRAFT: Project Execution Plan (PEP) 11572
CMS/Fermilab Organization chart 11804
US-CMS Upgrade Project Organization Chart 11822
Conceptual Design Report (CDR) 11562
WBS Structure (whole project, to level 3) 11605
WBS Structure (401.02 HCAL, to lowest level) 11606
WBS Structure (401.03 FPIX, to lowest level) 11607
WBS Structure (401.04 L1 Trigger, to lowest level) 11608
Glossary and WBS Dictionary 11801
Risk Management Plan 11701
Risk Register 11707
Contingency Rules 11598

 

Cost and Schedule

 

 
Cost Book at Level 1 (401 LHC CMS Detector Upgrade Project) 11840
Cost Book at Level 2 (401.01 Project Management) 11841
Cost Book at Level 2 (401.02 HCAL) 11842
Cost Book at Level 2 (401.03 FPIX) 11843
Cost Book at Level 2 (401.04 Trigger) 11844
Cost Basis of Estimates (BoEs) Index of BoEs
Cost Basis of Estimates (BoEs) -- Guidelines 11599
Schedule 11836

 

Technical Design Reports

 

 
HCAL Upgrades Technical Design Report CERN-LHCC-2012-015
Pixel Upgrades Technical Design Report CERN-LHCC-2012-016

 

 

 

 

 

lucas

Monthly Status Reporting

Monthly Status Reporting

The status of the US-CMS Upgrades project is assessed and reported on a monthly basis, as follows:

1) Project Office
  • Each month, the Project Office extracts from P6 two Excel files that show, for each L2 project:
    • All activities that have/should have started and that are not yet completed and reported on.
    • All resources assigned to the corresponding activities.

    The associated data are also included (start/end dates, responsible institutions, M&S and labor needs, etc.).

  • The files are posted as Google spreadsheets. This has the following advantages over the original Excel files:
    • Only a web browser -- on Linux, Mac, or Windows -- is needed to edit the files (not MS Excel).
    • Google docs supports multiple concurrent people working on the same document file.
    • Secure access is provided, using the CAMs Google login.
  • The Project Office informs the CAMs that the new files are available.
2) Control Account Managers (CAMs)
  • Each month, the CAMs are notified that new files are ready to be filled with status data, as described below.
  • The files will be in a USCMS Upgrades Google drive shared directory
  • To open a Google file to edit it, just click on the file name.

Activity status files

The CAMs should complete the following empty columns, for their areas of responsibility:

  • Actual Start date, if it has started, else write "Not started".
  • Expected finish date if the task is still in progress (else leave blank).
  • Actual Finish date if activity has finished, else leave blank.
  • Activity % complete is the estimated fraction of the activity (e.g. deliverables) that is complete.

For reference, the "Start" and "Finish" columns shows the planned start and finish dates.

Activity Resource Assignment

For each resource, the CAMs should complete the following empty columns, for their areas of responsibility:

  • Actual Units is the actual amount of the resource expended so far
  • Remaining Early Units is the estimate of the amount of this resource required to complete the activity.

The "Resource Type" column indicates whether the resource is "Materials" (M&S base cost in dollars), Labor (Fermilab labor in hours), or Nonlabor (University labor in hours -- yes, the P6 nomenclature is unfortunate). The "Budgeted Units" columns shows the planned amount of units for this resource.

  • After completing the files, the CAMs should notify their L2 manager.
3) L2 Manager
  • The L2 Manager verifies the content of the CAM reports and resolves any potential issues with the CAMs.
  • The L2 Manager notifies the PM when their two status files -- Activities and Resources -- are complete.
4) Project Manager
  • The PM verifies the content of the L2 reports and resolves any potential issues with the L2s.
  • The PM forwards the status reports to Project Controls and Project Finance.
5) Project Controls
  • The Project Controls enters the reported schedule data into P6.
  • The Project Controls generates a standard schedule impact monthly report.
6) Project Finance
  • The project's Finance Controller enters the reported resource data into the COBRA system.
  • The project's Finance Controller generates the standard earned value monthly reports.
7) Project Manager
  • The PM reports on the project status to the various project oversight bodies.

 

 

 

 

lucas

PPT Slide Template

PPT Slide Template

Here is a US-CMS Upgrades slide template using MS Powerpoint. To use it:

  1. Download the file and save under a new name
  2. Open the file and change the "Header and Footer" data (under "Insert" menu)
  3. Edit the "Master" slide under the "View" menu to delete / replace logo(s)

 

 

 

 

 

lucas

Redmine Issue Tracking

Redmine Issue Tracking

We are using the Fermilab Redmine issue tracking system to

  1. Keep track of general issues related to the upgrades project
  2. Handle minor change request items (e.g. a new cost number to enter in P6)
  3. To keep track of preparations for reviews

Access to Redmine requires a login with a Fermilab service account. Useful links:

Redmine admin notes:

  • Users only appear in the user menu once they have tried to access Redmine for the first time. You can also manually enter a user into Redmine.

 

 

 

 

lucas

Risk Management

Risk Management

The LHC CMS Detector Upgrade Project risk management process is described in the "Risk Management Plan" The risk planning process comprises the following steps:

Risk Identification

 

Qualitative Risk Analysis

 

Quantitative Risk Analysis

 

Plan Risk Responses
  1. L2s: Summarize the risks to your project on this Risk Twiki page with the help of this Risk Checklist
  2. L2s: Ask all your team to improve the list. Remove duplicates. Consolidate overlaps.
  3. L2s: Fill in one Risk Web form per risk (takes < 5 minutes). Try to complete all fields (probability, impacts, response plans, etc.) if known.
  4. Risk Manager: collect data from all risk forms and create a single Risk Register.
  5. Risk Manager + Project Team: meet to review the risk register and fill in any missing data.
  6. Risk Manager: rank risks using probability and impact thresholds in the "Risk Management Plan"
  7. Risk Manager: aggregate project-wide cost risk impacts for high- and medium-ranked risks.
  8. Project Scheduler and Risk Manager: assess risk impacts on critical path and higher-level milestones.
  9. Project Manager: determine project cost and schedule range and risk cost contingency allocation.
  10. For CD1: preliminary risk responses, where known, will be documented in the Risk Register.
  11. For CD2: comprehensive risk response plans will be prepared.

 

lucas

Uploading a document to DocDB

Uploading a document to DocDB

Use the self-explanatory DocDB web form to add a new document. Under "Who can see this?" and "Who can modify this?"click "advanced" to show a list of all groups. Select from the list as appropriate. Use Control+Click or Command+Click to select multiple items in the menu, e.g.

  • Public
  • CMS
  • US ProjectOffice
  • US Reviewers

Under Topics, please tag the document with as many topics as appropriate. Click the little + (plus) sign next to the topic name to see sub-topics. Notable top-level topics are:

  • Countries → USA
  • Upgrades
  • Tracker → Pixels
  • HCAL
  • Trigger → L1 Trigger

 

Access Control to Documents in DocDB

  • The US ProjectOffice DocDB access list is defined in the uscms-upgrades-project-office egroup.
  • The US Reviewers DocDB access list is defined in the uscms-upgrades-reviewers egroup.

To add or remove users in these groups, just add or remove the person in the CERN e-group as described here.

lucas

Writing the US-CMS Upgrades CDR / TDR

Writing the US-CMS Upgrades CDR / TDR

The US-CMS Upgrades Conceptual Design Report (CDR) and Technical Design Report (TDR) are prepared using the standard CMS "tdr" system(*):

  • The document is built from many files (sections, figures, etc.), so that many people can work concurrently.
  • The files are all stored in the CMS svn repository.
  • The "tdr" script is used to build a single PDF file of the complete CDR / TDR using all the input files.
Latest versions

See the latest TDR draft as a PDF file and as a DocDB record. See the final CDR in DocDB .

Getting started with the US-CMS CDR / TDR

Here is a record of a simple session that you can easily adjust to meet your own needs:

ssh -X lxplus.cern.ch -l lucas
mkdir TDR-WORK
cd TDR-WORK
svn co -N svn+ssh://svn.cern.ch/reps/tdr2
svn update -N tdr2/reports
svn update tdr2/utils
svn update tdr2/reports/us-up-401-tdr
eval `tdr2/utils/trunk/tdr runtime -csh`            (for csh, tcsh and related shells)
eval `tdr2/utils/trunk/tdr runtime -sh`             (for sh and related shells)
cd tdr2/reports/us-up-401-tdr/trunk
tdr b us-up-401-tdr
acroread /afs/cern.ch/user/l/lucas/TEST/tdr2/utils/trunk/tmp/us-up-401-tdr_temp.pdf
Using material from the Upgrade TDRs

For reference, a final snapshot of all the files used for the HCAL, Pixel and L1 Trigger Upgrade TDRs are available in imports directory:

tdr2/reports/uscms-upgrades-cdr/imports/

Do not develop anything new in the imports directory. Copy what you need into the main TDR area (e.g. tex or fig directories).

Access Control

Access to the svn repository is controlled by CERN afs userid. If you need access and do not already have it, contact Lucas Taylor (or George Alverson).

More Documentation

 

 

 

(*) The CMS TDR system was developed by, and is now supported by: George Alverson and Lucas Taylor.

lucas