Director's Independent Design Review
Director's Independent Design ReviewLHC CMS Detector Upgrade Project
Fermilab, May 14-16, 2013
- Review home page and general information on the Fermilab OPSS website
- Charge for the Review
- Review agenda
- Agenda and presentations in Indico
Follow these instructions for reviewers to get access to the documents below in the CMS DocDB database.
Review Documents
|
CMS-doc-# |
| Redacted CD-0 Mission Need | 11596 |
| DRAFT: Project Execution Plan (PEP) | 11572 |
| Conceptual Design Report (CDR) | 11562 |
| Supporting science and technical documents (i.e. requirements, specifications) | See CDR |
| Configuration Management Plan | See PEP |
| CMS / Fermilab Organization chart | 11804 |
| US-CMS Upgrade Project Organization Chart | 11822 |
| (Preliminary) Risk Management Plan | 11701 |
| (Preliminary) Risk Register | 11707 |
|
Technical Design Reports
|
|
| HCAL Upgrades Technical Design Report | CERN-LHCC-2012-015 |
| Pixel Upgrades Technical Design Report | CERN-LHCC-2012-016 |
|
Work Breakdown Structure
|
|
| Glossary and WBS Dictionary | 11801 |
| WBS Structure (whole project, to level 3) | 11605 |
| WBS Structure (401.02 HCAL, to lowest level) | 11606 |
| WBS Structure (401.03 FPIX, to lowest level) | 11607 |
| WBS Structure (401.04 L1 Trigger, to lowest level) | 11608 |