LHC CMS Detector Upgrade Project
Fermilab, July 16-18, 2013
- Follow these instructions for reviewers to get access to the documents below in the CMS DocDB database.
Previous Reviews |
CMS-doc-# |
CD-0 Mission Need - redacted | 11596 |
Report of the Director's Independent Design Review | 11859 |
Top-level Plans |
|
Acquisition Strategy | 11947 |
Key Assumptions | 11577 |
Project Execution Plan (PEP) | 11572 |
Project Management Plan (Draft v4) | 11569 |
Configuration Management Plan | 11936 |
Procurement Management Plan | 11585 |
Project Organization |
|
CMS / Fermilab Organization chart | 11804 |
US-CMS Upgrade Project Organization Chart | 11822 |
Technical Design |
|
401. LHC CMS Detector Upgrades Project - Conceptual Design Report | 11562 |
401.02 HCAL Upgrades Technical Design Report | CERN-LHCC-2012-015 |
401.03 Pixel Upgrades Technical Design Report | CERN-LHCC-2012-016 |
401.04 Trigger Upgrades Technical Design Report | CERN-LHCC-2013-011 |
Project Scope |
|
401. LHC CMS Detector Upgrades Project - Work Breakdown Structure (WBS) | 11605 |
401. LHC CMS Detector Upgrades Project - Glossary and WBS Dictionary | 11801 |
401.02 HCAL - Work Breakdown Structure | 11606 |
401.03 FPIX - Work Breakdown Structure | 11607 |
401.04 Trigger - Work Breakdown Structure | 11608 |
Project Cost |
|
Cost Basis of Estimates (BoEs) | Index of BoEs |
401. LHC CMS Detector Upgrades - Cost Basis of Estimates (BoEs) -- Guidelines | 11599 |
401. LHC CMS Detector Upgrades - Cost Book | 11840 |
401.01 Project Management - Cost Book at Level 2 | 11841 |
401.02 HCAL - Cost Book at Level 2 | 11842 |
401.03 FPIX - Cost Book at Level 2 | 11843 |
401.04 Trigger - Cost Book at Level 2 | 11844 |
Project Schedule |
|
401. LHC CMS Detector Upgrades Project - Milestone Dictionary | 11946 |
401. LHC CMS Detector Upgrades Project - Project Schedule | 11836 (All) |
401.01 Project Management - Project Schedule at Level 2 | 11836 (PM) |
401.02 HCAL - Project Schedule at Level 2 | 11836 (HCAL) |
401.03 FPIX - Project Schedule at Level 2 | 11836 (FPIX) |
401.04 Trigger - Project Schedule at Level 2 | 11836 (Trigger) |
401. LHC CMS Detector Upgrades Project - Critical paths | 11836 (Critical Paths) |
Project Risk |
|
Contingency Rules | 11598 |
(Preliminary) Risk Management Plan | 11701 |
(Preliminary) Risk Register | 11707 |
Safety and Quality Assurance |
|
Integrated Safety Management Plan | 11587 |
Quality Management Plan | 11584 |
Preliminary Hazard Analysis Document | 11816 |
NEPA categorical exclusion | 11958 |