CMS-doc-# | |
| 2014-08-27: Report of the CD-1 DOE Review | 12229 | |
| 2013-07-18: Report of the CD-1 Director's Review | 11971 | |
| 2013-05-16: Report of the Director's Independent Design Review | 11859 | |
| 2012-08-15: CD-0 Mission Need (redacted) | 11596 | |
|
General Links |
||
| DOE SC Office of Project Assessment | ||
| Fermilab Office of Project Support Services (OPSS) | ||
| Program and Project Management for the Acquisition of Capital Assets | DOE Order 413.3B | |
|
Top-level Plans |
||
| Acquisition Strategy | 11947 | Update if reqd. and approve |
| Key Assumptions | 11577 | Update if reqd. |
| Project Execution Plan (PEP) | 11572 | Update if reqd. and approve |
| Project Management Plan | 11569 | Update if reqd. and approve |
| Configuration Management Plan | 11936 | Update if reqd. and approve |
| Procurement Management Plan | 11585 | Update if reqd. and approve |
| Proposal for the Joint Monitoring of DOE and NSF Earned Value Management Information | 12216 | Draft -- for approval |
|
Project Organization |
||
| CMS / Fermilab Organization chart | 11804 | OK |
| US-CMS Upgrade Project Organization Chart | 11822 | OK |
|
Technical Design |
||
| LHC CMS Detector Upgrade Project - Technical Design Report | 12201 | Draft -- in progress |
| Document describing completeness of design | FIXME | Not started |
| LHC CMS Detector Upgrade Project - Conceptual Design Report | 11562 | OK |
| 401.02 HCAL Upgrades - CMS Technical Design Report | CERN-LHCC-2012-015 | Approved |
| 401.03 Pixel Upgrades - CMS Technical Design Report | CERN-LHCC-2012-016 | Approved |
| 401.04 Trigger Upgrades - CMS Technical Design Report | CERN-LHCC-2013-011 | Approved |
|
Project Scope |
||
| 401. LHC CMS Detector Upgrades Project - Work Breakdown Structure (WBS) | 11605 | Stable |
| 401. LHC CMS Detector Upgrades Project - Glossary and WBS Dictionary | 11801 | Update if necessary |
| 401.02 HCAL - Work Breakdown Structure | 11606 | Stable |
| 401.03 FPIX - Work Breakdown Structure | 11607 | Stable |
| 401.04 Trigger - Work Breakdown Structure | 11608 | Stable |
|
Project Cost |
||
| Cost estimate uncertainty -- Contingency Rules | 11598 | Stable |
| Cost Basis of Estimates (BoEs) | Index of BoEs | Update and review |
| 401. LHC CMS Detector Upgrades - Cost Book | 11840 | Update |
|
Project Schedule |
||
| 401. LHC CMS Detector Upgrades Project - Milestone Dictionary | 11946 | Update and review |
| 401. LHC CMS Detector Upgrades Project - Milestones ordered by date (waterfall report) | 12009 | Update and review |
| Project Schedule for: 401. LHC CMS Detector Upgrades Project | 11836 (All) | Update and review |
| Project Schedule for: 401.01 Project Management | 11836 (PM) | Update and review |
| Project Schedule for: 401.02 HCAL | 11836 (HCAL) | Update and review |
| Project Schedule for: 401.03 FPIX | 11836 (FPIX) | Update and review |
| Project Schedule for: 401.04 Trigger | 11836 (Trigger) | Update and review |
| Critical Path for: 401. LHC CMS Detector Upgrades Project | 11836 (Project CP) | Analyze and review |
| Critical Path for: 401.02 HCAL | 11836 (HCAL CP) | Analyze and review |
| Critical Path for: 401.03 FPIX | 11836 (FPIX CP) | Analyze and review |
| Critical Path for: 401.04 Trigger | 11836 (Trigger CP) | Analyze and review |
|
Project Risk |
||
| (Preliminary) Risk Management Plan | 11701 | Update for PRA |
| (Preliminary) Risk Register | 11707 | Update and analyze in PRA |
|
Safety and Quality Assurance |
||
| Integrated Safety Management Plan | 11587 | Approved -- check if updates needed |
| Quality Management Plan | 11584 | Approved -- check if updates needed |
| Preliminary Hazard Analysis Report | 11816 | Approved -- check if updates needed |
| NEPA categorical exclusion | 11958 |