LHC CMS Detector Upgrade Project

Fermilab, May 15-17, 2013

This page contains links to documents to be assessed in this informal review of cost and schedule.

Follow these instructions for reviewers to get access to the documents below in the CMS DocDB database.

 

 

 



Overview Documents

 

CMS-doc-#
Key Assumptions 11577
DRAFT: Project Execution Plan (PEP) 11572
CMS/Fermilab Organization chart 11804
US-CMS Upgrade Project Organization Chart 11822
Conceptual Design Report (CDR) 11562
WBS Structure (whole project, to level 3) 11605
WBS Structure (401.02 HCAL, to lowest level) 11606
WBS Structure (401.03 FPIX, to lowest level) 11607
WBS Structure (401.04 L1 Trigger, to lowest level) 11608
Glossary and WBS Dictionary 11801
Risk Management Plan 11701
Risk Register 11707
Contingency Rules 11598

 

Cost and Schedule

 

 
Cost Book at Level 1 (401 LHC CMS Detector Upgrade Project) 11840
Cost Book at Level 2 (401.01 Project Management) 11841
Cost Book at Level 2 (401.02 HCAL) 11842
Cost Book at Level 2 (401.03 FPIX) 11843
Cost Book at Level 2 (401.04 Trigger) 11844
Cost Basis of Estimates (BoEs) Index of BoEs
Cost Basis of Estimates (BoEs) -- Guidelines 11599
Schedule 11836

 

Technical Design Reports

 

 
HCAL Upgrades Technical Design Report CERN-LHCC-2012-015
Pixel Upgrades Technical Design Report CERN-LHCC-2012-016