LHC CMS Detector Upgrade Project
Fermilab, May 15-17, 2013
This page contains links to documents to be assessed in this informal review of cost and schedule.
- See also Director's Independent Design Review
- Review agenda and links to presentations
Follow these instructions for reviewers to get access to the documents below in the CMS DocDB database.
Overview Documents
|
CMS-doc-# |
Key Assumptions | 11577 |
DRAFT: Project Execution Plan (PEP) | 11572 |
CMS/Fermilab Organization chart | 11804 |
US-CMS Upgrade Project Organization Chart | 11822 |
Conceptual Design Report (CDR) | 11562 |
WBS Structure (whole project, to level 3) | 11605 |
WBS Structure (401.02 HCAL, to lowest level) | 11606 |
WBS Structure (401.03 FPIX, to lowest level) | 11607 |
WBS Structure (401.04 L1 Trigger, to lowest level) | 11608 |
Glossary and WBS Dictionary | 11801 |
Risk Management Plan | 11701 |
Risk Register | 11707 |
Contingency Rules | 11598 |
Cost and Schedule
|
|
Cost Book at Level 1 (401 LHC CMS Detector Upgrade Project) | 11840 |
Cost Book at Level 2 (401.01 Project Management) | 11841 |
Cost Book at Level 2 (401.02 HCAL) | 11842 |
Cost Book at Level 2 (401.03 FPIX) | 11843 |
Cost Book at Level 2 (401.04 Trigger) | 11844 |
Cost Basis of Estimates (BoEs) | Index of BoEs |
Cost Basis of Estimates (BoEs) -- Guidelines | 11599 |
Schedule | 11836 |
Technical Design Reports
|
|
HCAL Upgrades Technical Design Report | CERN-LHCC-2012-015 |
Pixel Upgrades Technical Design Report | CERN-LHCC-2012-016 |