After the success of the LHC restart in late 2009, the machine had its first Technical Shutdown over the Christmas period, lasting until the end of February. This time was used fruitfully, both by the accelerator and by CMS (see the first CMS Times…
This morning between 8:20 and 8:50 for the first time the full Tracker (Strips and Pixel) was turned ON and successfully collected data in Global run with a quiet single beam running in LHC. This is a major achievement. Everything seems all right…
Only TOB was turned ON today after LHC Opearation declared stable beams for a while. Below is a 900 GeV p-p collision event seen by the TOB in Run 122314, Evt 8605569.