This page is obsolete --please use this:

new page at Fermilab

 

 


 

 

LHC CMS Detector Upgrade Project

Fermilab, August 26-27, 2013




Previous Reviews and References
CMS-doc-#
CD-0 Mission Need (redacted) 11596
Report of the Director's Independent Design Review 11859
Report of the CD-1 Director's Review 11971
DOE SC Office of Project Assessment  
Program and Project Management for the Acquisition of Capital Assets DOE Order 413.3B

 

Top-level Plans
 
Acquisition Strategy -- draft under review 11947
Key Assumptions 11577
Project Execution Plan (PEP) -- draft under review 11572
Project Management Plan -- draft under review 11569
Configuration Management Plan 11936
Procurement Management Plan -- draft under review 11585

 

Project Organization
 
CMS / Fermilab Organization chart 11804
US-CMS Upgrade Project Organization Chart 11822

 

Technical Design
 
401. LHC CMS Detector Upgrades Project - Conceptual Design Report 11562
401.02 HCAL Upgrades Technical Design Report CERN-LHCC-2012-015
401.03 Pixel Upgrades Technical Design Report CERN-LHCC-2012-016
401.04 Trigger Upgrades Technical Design Report CERN-LHCC-2013-011

 

Project Scope
 
401. LHC CMS Detector Upgrades Project - Work Breakdown Structure (WBS) 11605
401. LHC CMS Detector Upgrades Project - Glossary and WBS Dictionary 11801
401.02 HCAL - Work Breakdown Structure 11606
401.03 FPIX - Work Breakdown Structure 11607
401.04 Trigger - Work Breakdown Structure 11608

 

Project Cost
 
Cost estimate uncertainty -- Contingency Rules 11598
Cost Basis of Estimates (BoEs) Index of BoEs
401. LHC CMS Detector Upgrades - Cost Basis of Estimates (BoEs) -- Guidelines 11599
401. LHC CMS Detector Upgrades - Cost Book 11840
401.01 Project Management - Cost Book at Level 2 11841
401.02 HCAL - Cost Book at Level 2 11842
401.03 FPIX - Cost Book at Level 2 11843
401.04 Trigger - Cost Book at Level 2 11844

 

Project Schedule
 
401. LHC CMS Detector Upgrades Project - Milestone Dictionary 11946
401. LHC CMS Detector Upgrades Project - Milestones ordered by date (waterfall report) 12009
Project Schedule for: 401. LHC CMS Detector Upgrades Project 11836 (All)
Project Schedule for: 401.01 Project Management 11836 (PM)
Project Schedule for: 401.02 HCAL 11836 (HCAL)
Project Schedule for: 401.03 FPIX 11836 (FPIX)
Project Schedule for: 401.04 Trigger 11836 (Trigger)
Critical Path for: 401. LHC CMS Detector Upgrades Project 11836 (Project CP)
Critical Path for: 401.02 HCAL 11836 (HCAL CP)
Critical Path for: 401.03 FPIX 11836 (FPIX CP)
Critical Path for: 401.04 Trigger 11836 (Trigger CP)

 

Project Risk
 
(Preliminary) Risk Management Plan 11701
(Preliminary) Risk Register 11707

 

Safety and Quality Assurance
 
Integrated Safety Management Plan -- approved 11587
Quality Management Plan -- approved 11584
Preliminary Hazard Analysis Report -- approved 11816
NEPA categorical exclusion 11958