Author: January 31st, 2022 – By Alexandre Zabi

  • Real time analysis with the CMS Level-1 Trigger

    Real time analysis with the CMS Level-1 Trigger

    The challenge of Run3: CMS is preparing to resume its operations for the Run-3 of the Large Hadron Collider (LHC) after a 3-year long shutdown called LS2 (2019-2021).

    Explore →