Category: Article

  • CB Newsletter: 9 December 2013

    It has been a wonderful year for CMS.

    Explore →

  • CMS presents evidence for Higgs decays to fermions

    CMS presents evidence for Higgs decays to fermions

    Several measurements of properties of the Higgs unveiled at CERN seminar.

    Explore →

  • Editorial – News, November 2013

    Editorial – News, November 2013

    Dear friends, welcome to the first edition of the new CMS monthly newsletter.

    Explore →

  • Editorial – News, November 2013

    Editorial – News, November 2013

    Dear friends, welcome to the first edition of the new CMS monthly newsletter.

    Explore →

  • Editorial – News, November 2013

    Editorial – News, November 2013

    Dear friends, welcome to the first edition of the new CMS monthly newsletter.

    Explore →

  • Surveyors measure new CSC layer with photogrammetry

    Surveyors measure new CSC layer with photogrammetry

    CERN’s surveyors conduct diverse measurements to ensure, for example, accurate positioning of magnets, detectors and other equipment.

    Explore →

  • Successful trial installation of RPC modules in CMS

    Successful trial installation of RPC modules in CMS

    Two new wheels of the Resistive Plate Chambers (RPCs) of the muon system are being installed during the LHC’s first Long Shutdown (LS1).

    Explore →

  • News from the CMS experimental site: 22 November 2013

    News from the CMS experimental site: 22 November 2013

    The past two weeks have seen several pivotal steps taken towards achieving some of the key goals for CMS during the LHC’s first Long Shutdown (LS1).

    Explore →

  • Performing keyhole surgery on the ECAL endcaps

    Performing keyhole surgery on the ECAL endcaps

    Repairs needed to be performed on a region consisting of 75 channels in the positive ECAL endcap, which had been inoperable since 2009.

    Explore →

  • Spanish schools take virtual tour of CMS cavern

    Spanish schools take virtual tour of CMS cavern

    Early in the morning on 22 October, I grabbed my laptop and safety helmet and took the elevator 30 storeys underground to the CMS experimental cavern.

    Explore →