Category: Collaboration
-
Tracker yields data again!
After the refurbishment of the Cooling plants (see next article) and 5 weeks of intense re-commissioning work, last night the Tracker joined the MW Global Run at zero tesla.
-
Tracker back into operation
A series of important milestones have been passed during the last 3 months.
-
CMS forward pixels: better than ever
In July of last year we successfully inserted the pixel detector inside CMS and successfully integrated and operated it with the rest of the CMS detector during the CRAFT run.
-
Forward Pixels Detectors reinstalled
The last two weeks the Forward Pixels (FPIX) detectors were both reinstalled and successfully tested.
-
Gian Mario Bilei is the new Tracker Project Manager.
-
Pictures of events in the 3.8T field
Loic Quertenmont has produced a lot of very nice pictures of events in the 3.8T field.
-
Cosmic tracks in 2.4T magnetic field.
-
Commissioning progress. Recent images of tracks, both firsts.
-
Over 1 million cosmic ray events taken last night!
-
Triggered cosmic ray tracks.







