Tag: load test
-
Load Testing over 365 Tonnes on ‘Spindles’ in Preparation for Hi-Lumi CMS
CMS successfully carried out key tests for the lifting system needed in the construction of Hi Lumi CMS during the end of year stop 2025/2026. Four thin legs emerge from the floor of the CMS cavern to lift incredibly heavy parts of the CMS detector.
